DocumentCode :
3484095
Title :
Priority resolution of modernization of power industry objects
Author :
Nazarychev, Alexander ; Andreev, Dmitry ; Tadzhibaev, Alexey
Author_Institution :
Ivanovo Representation, St. Petersburg Power Eng. Inst. (PPEIU), St. Petersburg
fYear :
2005
fDate :
27-30 June 2005
Firstpage :
1
Lastpage :
3
Abstract :
In the report the priority resolution procedure of power industry objects of technical re-equipment are presented. The procedure takes into account the technical state of electrical equipment, economic circumstances and the investment value in power industry technical objects re-equipment. The procedure was approved at the several substations of the ";Federal Network Company EES"; in Russia.
Keywords :
electricity supply industry; electrical equipment technical state; power industry objects modernization; priority resolution procedure; Computer networks; Cost function; Equations; Investments; Maintenance; Power generation economics; Power industry; Power system economics; Power transformers; Substations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Tech, 2005 IEEE Russia
Conference_Location :
St. Petersburg
Print_ISBN :
978-5-93208-034-4
Electronic_ISBN :
978-5-93208-034-4
Type :
conf
DOI :
10.1109/PTC.2005.4524544
Filename :
4524544