DocumentCode :
3490804
Title :
Placement of FACTS devices in open power market
Author :
Singh, S.N. ; David, A.K.
Author_Institution :
Dept. of Electr. Eng., Roorkee Univ., India
Volume :
1
fYear :
2000
fDate :
30 Oct.-1 Nov. 2000
Firstpage :
173
Abstract :
The ongoing power system restructuring requires an opening of unused potentials of transmission systems due to environmental, right-of-way and cost problems which are major hurdles for power transmission network expansion. FACTS devices can be an alternative to reduce the flows in heavily loaded lines, resulting in an increased loadability, low system loss, improved stability of the network, reduced cost of production and fulfilled contractual requirement by controlling the power flows in the network. This paper suggests, first, the few optimal locations of FACTS devices and then determines the best optimal location in order to reduce the production cost along with the device cost. The allocation and requirement are also discussed. The effectiveness of the purposed methods is demonstrated on IEEE 14-bus system.
Keywords :
costing; electricity supply industry; flexible AC transmission systems; optimisation; power system analysis computing; power transmission economics; power transmission planning; FACTS devices placement; IEEE 14-bus system; computer simulation; device cost; heavily loaded lines; loadability; open power market; power network stability; power system loss; power system restructuring; power transmission network expansion; production cost;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Advances in Power System Control, Operation and Management, 2000. APSCOM-00. 2000 International Conference on
Print_ISBN :
0-85296-791-8
Type :
conf
DOI :
10.1049/cp:20000386
Filename :
950290
Link To Document :
بازگشت