• DocumentCode
    3493174
  • Title

    The planning and implementation of a EMC successful product safety program

  • Author

    Sims, Thomas P.

  • Author_Institution
    Diversified TEST Technols. Inc., Groton, NY, USA
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    771
  • Abstract
    Planning a project is no small task regardless of the product type or scale. EMC/product safety projects are no exception. In fact these projects represent large efforts even on small projects. Many factors involved with the project are out of the engineers control. Some of these include, but are not limited to, hardware design, vendors, suppliers, regulatory and testing groups. On some level the design may also be out of the engineers control. To exaggerate the confusion, the mandatory test standards are constantly being regulated. An ideal EMC/safety product will successfully go through the testing process and pass all required standards the first time. Is this a high goal? Yes, but it is attainable and is being achieved by proper planning from the ground up. This paper discusses the factors involved in making a success of such a product
  • Keywords
    electromagnetic compatibility; planning; product development; safety; EMC successful product safety program; hardware design; mandatory test standards; project planning; regulatory groups; suppliers; testing groups; vendors; Costs; Design engineering; Electromagnetic compatibility; Hardware; Job shop scheduling; Product safety; Safety devices; Technology planning; Testing; Time to market;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electromagnetic Compatibility, 2001. EMC. 2001 IEEE International Symposium on
  • Conference_Location
    Montreal, Que.
  • Print_ISBN
    0-7803-6569-0
  • Type

    conf

  • DOI
    10.1109/ISEMC.2001.950472
  • Filename
    950472