• DocumentCode
    3498406
  • Title

    After laying tests of 400 kV XLPE cable systems for Bewag Berlin

  • Author

    Plath, R. ; Herrmann, U. ; Polster, K. ; Spiegelberg, J. ; Coors, P.

  • Author_Institution
    Inst. Pruffeld fur Elektrische Hochleistungstech. GmbH, Berlin, Germany
  • Volume
    5
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    276
  • Abstract
    The after laying tests carried out on a 400 kV XLPE cable double-system (length 6.3 km) used AC test voltage combined with partial discharges (PD) measurement on joints and sealing ends for the first time. The approx. 30 MVA test power was delivered by the two-stage mobile resonant test system of variable frequency which was specifically designed for this duty. The requirements to be met by the test system as well as the test arrangement and its connection technology are explained. For the PD measurements, directional couplers were integrated into each joint. The data measured on all joints were simultaneously recorded and centrally evaluated. The voltage tests carried out up to 400 kV and the high-sensitive PD measurements done on the joints with a PD detection level of 2 pC confirm that such test and measuring systems allow to achieve informative commissioning and diagnostic tests on extra high-voltage cables also under difficult on-site conditions
  • Keywords
    XLPE insulation; 30 MVA; 400 kV; 6.3 km; AC test voltage; PD detection level; PD measurements; XLPE power cable systems; after-laying tests; commissioning; diagnostic tests; partial discharges measurement; two-stage mobile resonant test system;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    High Voltage Engineering, 1999. Eleventh International Symposium on (Conf. Publ. No. 467)
  • Conference_Location
    London
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-719-5
  • Type

    conf

  • DOI
    10.1049/cp:19990939
  • Filename
    818291