DocumentCode :
350043
Title :
A performance based planning of water supply service system under seismic risk
Author :
TANIMOTO, Keishi ; Kita, Hideyuki
Author_Institution :
Fac. of Eng., Tottori Univ., Japan
Volume :
5
fYear :
1999
fDate :
1999
Firstpage :
997
Abstract :
This study aims to develop a model where the level of water supply means is determined from the view point of the performance level of water supply system in the occurrence of a severe earthquake. We focus on that the performance level depends not only on the remaining water supply system from the earthquake but also on both the local conditions and the attribute of residents. As a result, a resultant extent to upgrade waterworks in terms of earthquake-proofness which determines the supply level of waterworks can be found by comparing the benefit and cost of their upgrading under the given local conditions and the attributes of residents
Keywords :
operations research; planning; project management; water supply; earthquake; local conditions; planning; seismic risk; water supply service; Costs; Earthquakes; Power system modeling; Road transportation; Water resources;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man, and Cybernetics, 1999. IEEE SMC '99 Conference Proceedings. 1999 IEEE International Conference on
Conference_Location :
Tokyo
ISSN :
1062-922X
Print_ISBN :
0-7803-5731-0
Type :
conf
DOI :
10.1109/ICSMC.1999.815690
Filename :
815690
Link To Document :
بازگشت