• DocumentCode
    3503502
  • Title

    Minimizing makespan at module assembly shop in shipbuilding

  • Author

    Zheng, Junli ; Jiang, Zhibin ; Chen, Feng ; Chen, Qiang

  • Author_Institution
    Dept. of Ind. Eng. & Logistics, Shanghai Jiao Tong Univ., Shanghai
  • Volume
    2
  • fYear
    2008
  • fDate
    12-15 Oct. 2008
  • Firstpage
    1794
  • Lastpage
    1799
  • Abstract
    With the wide application of module shipbuilding mode, module spatial scheduling problems occur in various working areas and constrain the productivity of shipbuilding. It is a NP-hard problem to obtain optimum scheduling due to the complex constraints. On the basis of investigation on the characteristics of module shape and processing technique, a heuristic module spatial scheduling algorithm meeting due dates, maximizing utilization of work plates and minimizing makespan is developed with the consideration of spatial and time constraints. Also, a target of spatiotemporal utilization ratio is proposed and used in improving the algorithm. With the algorithm, visual results of daily layouts and work orders can be easily obtained. The operation results using real shipyard data show that the module spatial scheduling performance and efficiency are satisfactory.
  • Keywords
    assembling; optimisation; scheduling; shipbuilding industry; NP-hard problem; makespan; module assembly shop; module spatial scheduling problems; optimum scheduling; real shipyard data; shipbuilding; spatiotemporal utilization ratio; Makespan; Shipbuilding; Spatial scheduling; Spatiotemporal utilization ratio;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-2012-4
  • Electronic_ISBN
    978-1-4244-2013-1
  • Type

    conf

  • DOI
    10.1109/SOLI.2008.4682821
  • Filename
    4682821