Model and scheduling of a continuous galvanizing line
Author
Gao, Cong ; Tang, Lixin ; Wang, Ying
Author_Institution
Inst. of Logistic, Northeastern Univ., Shenyang
Volume
2
fYear
2008
fDate
12-15 Oct. 2008
Firstpage
1829
Lastpage
1834
Abstract
In this paper, we introduce a continuous galvanizing line in a steel plant which is one of the biggest iron and steel enterprises of the world. The continuous galvanizing line we research produces principally two kinds of coils, inner coils and outer coils. Due to the technical constraint, outer coils can not be produced continuously more than a specified number. So the inner coils must be inserted between outer coils. The difficulty of solving the problem is the interrelation of sequencing these two kinds of coils. No model and algorithm about such a scheduling problem has been published. We propose an integer programming model to describe the scheduling problem. To solve the problem, a heuristic based on tabu search is developed. Due to the model of the scheduling problem is an integer programming model, problems with less than 100 coils can be solved by CPLEX 11.0 MIP optimizer to obtain the optimal solution or a lower bound of the problem. By comparing our heuristic schedule and the CPLEX schedule, the tabu search heuristic is proven to be effective.
Keywords
galvanising; integer programming; iron; production management; scheduling; search problems; steel industry; continuous galvanizing line; integer programming model; iron enterprise; scheduling problem; steel enterprise; steel plant; tabu search; Tabu Search; modeling; steel industry;
fLanguage
English
Publisher
ieee
Conference_Titel
Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-2012-4
Electronic_ISBN
978-1-4244-2013-1
Type
conf
DOI
10.1109/SOLI.2008.4682827
Filename
4682827
Link To Document