Title :
The Analysis, Diagnosis and Improvement to Production Logistics in CD Section of Enterprise
Author :
Chen Yong ; Wang Xiao ; Lin Feilong
Author_Institution :
Inst. of Ind. Eng., Zhejiang Univ. of Technol., Hangzhou
Abstract :
Taking the production logistics of CD section as research object, this paper researches, analyzes, and diagnoses the three parts, namely plastic component stock logistics, packaging material fittings stock logistics, and warehousing operation logistics, and then improves the irrational part. After the optimization, the transport distance and the total operation quantity of production logistics in CD section are reduced. The improvement of logistics makes the production operation more fluency and efficient.
Keywords :
logistics; packaging; production engineering computing; warehousing; CD section; enterprise; packaging material fittings stock logistics; plastic component stock logistics; production logistics; warehousing operation logistics; Finishing; Fitting; Industrial engineering; Ligaments; Logistics; Manufacturing processes; Optimized production technology; Pipelines; Plastic packaging; Warehousing;
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location :
Shanghai
Print_ISBN :
978-1-4244-1311-9
DOI :
10.1109/WICOM.2007.1053