• DocumentCode
    3507871
  • Title

    Model-Based Time Estimate of Software Test Processes

  • Author

    Zhang Weimin ; Zhou Bosheng ; Luo Wenjie

  • Author_Institution
    Beijing Aerosp. Control Center, Beijing
  • fYear
    2007
  • fDate
    21-25 Sept. 2007
  • Firstpage
    4946
  • Lastpage
    4949
  • Abstract
    In order to plan and manage the process of software test, it is necessary to estimate the test process time exactly. An improved process time estimate model was proposed based on analyzing other process models. The model takes into account the effects of rework possibilities and rework impact factors on the process time. What makes the proposed model different from others is that the rework impact factors in this model affect the remaining time of the rework task other than the task duration. The time estimate methods are illustrated by an example of a software test process. The analysis of the models and the comparison between them are presented.
  • Keywords
    program testing; model-based time estimate; process time estimate model; rework impact factor; rework possibility; software testing; task duration; Aerospace control; Aerospace testing; Assembly systems; Educational institutions; Phase detection; Phase estimation; Sequential analysis; Software systems; Software testing; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4244-1311-9
  • Type

    conf

  • DOI
    10.1109/WICOM.2007.1212
  • Filename
    4340987