• DocumentCode
    3507976
  • Title

    Application of CMMI in Innovation Management

  • Author

    Li Jing

  • Author_Institution
    Shanghai Jiao Tong Univ., Shanghai
  • fYear
    2007
  • fDate
    21-25 Sept. 2007
  • Firstpage
    4966
  • Lastpage
    4969
  • Abstract
    In this paper we look through innovation management in small project-based firm, such as software engineering and construction companies, which are service firms that conduct projects for their clients. This research is trying to introduce the technology of Capability Maturity Modelreg Integration (CMMI), which is a process improvement approach that provides organizations with the essential elements of effective processes. Take ABC Software Company as a case study, we compared the performance before and after the introduction of CMMI in the firm and figured out quite a few positive results. To conclude, small project-based firms will benefit a lot if they take CMMI into their process of innovation management, particularly for those R&D firms, since the implementation of CMMI leads them to a promising future with higher efficiency and better effects. This study provides a starting point for the community in considering this important issue.
  • Keywords
    Capability Maturity Model; DP management; innovation management; CMMI; R&D firm; capability maturity model integration; innovation management; process improvement approach; small project-based firm; software firm; Application software; Capability maturity model; Computer industry; Environmental management; Innovation management; Project management; Research and development; Software engineering; Software performance; Technological innovation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4244-1311-9
  • Type

    conf

  • DOI
    10.1109/WICOM.2007.1217
  • Filename
    4340992