Limited Resources Project Management Research Based on Critical Paths
Author
Liu, Xueyan ; Li, Cunbin
Author_Institution
Inst. of Bus. Manage., North China Electr. Power Univ., Beijing
fYear
2007
fDate
21-25 Sept. 2007
Firstpage
5153
Lastpage
5156
Abstract
The researches of project management almost focus on the critical paths. However, there are few researches on the limited resources based on the critical paths. This paper gets the processes of the limited resources distributions based on the critical paths and sets a proposal for distributions of the limited resources. It introduces a penalty function to solve the limited resources distribution of the uncritical paths as a quantitative method. There is an example to show the use of the method and relevant measures to make sure the Time or minimize the impact to the Time. This method can solve the problem of the limited resources distributions in small corporations, which has practical values.
Keywords
optimisation; project management; resource allocation; critical path; limited resource distributions; limited resource project management; penalty function; quantitative method; Constraint optimization; Cost function; Energy management; Project management; Proposals; Resource management; Safety; Time measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location
Shanghai
Print_ISBN
978-1-4244-1311-9
Type
conf
DOI
10.1109/WICOM.2007.1262
Filename
4341037
Link To Document