Limited Resources Project Management Research Based on Critical Paths
Author :
Liu, Xueyan ; Li, Cunbin
Author_Institution :
Inst. of Bus. Manage., North China Electr. Power Univ., Beijing
fYear :
2007
fDate :
21-25 Sept. 2007
Firstpage :
5153
Lastpage :
5156
Abstract :
The researches of project management almost focus on the critical paths. However, there are few researches on the limited resources based on the critical paths. This paper gets the processes of the limited resources distributions based on the critical paths and sets a proposal for distributions of the limited resources. It introduces a penalty function to solve the limited resources distribution of the uncritical paths as a quantitative method. There is an example to show the use of the method and relevant measures to make sure the Time or minimize the impact to the Time. This method can solve the problem of the limited resources distributions in small corporations, which has practical values.
Keywords :
optimisation; project management; resource allocation; critical path; limited resource distributions; limited resource project management; penalty function; quantitative method; Constraint optimization; Cost function; Energy management; Project management; Proposals; Resource management; Safety; Time measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location :
Shanghai
Print_ISBN :
978-1-4244-1311-9
Type :
conf
DOI :
10.1109/WICOM.2007.1262
Filename :
4341037
Link To Document :
بازگشت