    Limited Resources Project Management Research Based on Critical Paths

  • Author

    Liu, Xueyan ; Li, Cunbin

  • Author_Institution
    Inst. of Bus. Manage., North China Electr. Power Univ., Beijing
  • fYear
    2007
  • fDate
    21-25 Sept. 2007
  • Firstpage
    5153
  • Lastpage
    5156
  • Abstract
    The researches of project management almost focus on the critical paths. However, there are few researches on the limited resources based on the critical paths. This paper gets the processes of the limited resources distributions based on the critical paths and sets a proposal for distributions of the limited resources. It introduces a penalty function to solve the limited resources distribution of the uncritical paths as a quantitative method. There is an example to show the use of the method and relevant measures to make sure the Time or minimize the impact to the Time. This method can solve the problem of the limited resources distributions in small corporations, which has practical values.
  • Keywords
    optimisation; project management; resource allocation; critical path; limited resource distributions; limited resource project management; penalty function; quantitative method; Constraint optimization; Cost function; Energy management; Project management; Proposals; Resource management; Safety; Time measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4244-1311-9
  • Type

    conf

  • DOI
    10.1109/WICOM.2007.1262
  • Filename
    4341037