Title :
Substitution Scheduling of Human Resources in Project
Author :
Liu, Zhenyuan
Author_Institution :
Inst. of Syst. Eng., Huazhong Univ. of Sci. & Technol., Wuhan
fYear :
2007
fDate :
21-25 Sept. 2007
Firstpage :
5172
Lastpage :
5175
Abstract :
Substitution scheduling of human resources is an important and factual problem in project management. The problem is presented as a mix integer programming model with the objective of minimizing total cost of project considering reward of early completion and delay penalty. A heuristics is developed to solve the model, in which the main framework is an enumeration procedure embedded a serial scheduling schema for solution of project scheduling problem with the same objective, and its time complexity is analyzed. The result of a computational example shows that the approach is feasible.
Keywords :
human resource management; integer programming; labour resources; project management; scheduling; delay penalty; human resources; mix integer programming model; project management; serial scheduling schema; substitution scheduling; time complexity; Costs; Delay; Genetic algorithms; Humans; Linear programming; Processor scheduling; Project management; Recruitment; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location :
Shanghai
Print_ISBN :
978-1-4244-1311-9
Type :
conf
DOI :
10.1109/WICOM.2007.1266
Filename :
4341041
Link To Document :
بازگشت