DocumentCode
3509387
Title
Framework System Design of Construction Project Document Management During the Initial Phase Based on WBS
Author
Wu Yunna ; Yao Na
Author_Institution
Sch. of Bus. Adm., North China Electr. Power Univ., Beijing
fYear
2007
fDate
21-25 Sept. 2007
Firstpage
5248
Lastpage
5251
Abstract
The documents of construction project during the initial phase are the fundamental and important evidences for the project. As it is not easy to collect all documents orderly and systematically, it is necessary to establish an integrated management system with all documents collecting procedures covered to make a clear clue for document collection. This paper, with WBS as a design system, divides the initial phase into four sub-phases (decision-making, construction-preparing, reconnaissance and design and construction permits-fetching) which will be subdivided into more concrete working procedures. Based on this, we promote a systematic framework for the initial phase management, especially and creatively, with document management included. This framework, adhering to the integration idea - "one center, vertical integration", regards the document collection and workflow as an organic whole, in order to make the document collecting procedures more systematic and efficient, and then provide a perfect guide and a reference to the practical work
Keywords
construction industry; document handling; project management; systems analysis; WBS; construction project; document management; initial phase management; system design; Contracts; Design engineering; Engineering management; Environmental management; Financial management; Meeting planning; Power system management; Project management; Quality management; Reconnaissance;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location
Shanghai
Print_ISBN
978-1-4244-1311-9
Type
conf
DOI
10.1109/WICOM.2007.1285
Filename
4341060
Link To Document