DocumentCode
3509430
Title
A simulated annealing approach to short-term hydro scheduling
Author
Wong, Kit Po ; Wong, Yin Wa ; Yu, Yunbei
Author_Institution
Dept. of Electr. & Electron. Eng., Western Australia Univ., Nedlands, WA, USA
fYear
1993
fDate
1993
Firstpage
323
Lastpage
328
Abstract
This paper develops a hydro-scheduling algorithm based on the simulated annealing technique for a two-interval schedule horizon. In the algorithm, the load balance constraint, the total water discharge constraint and the constraint on the operation limits of the equivalent thermal generator are fully accounted for. The performance of the algorithm is demonstrated through its application to a test system. The results are presented and are compared to a conventional method.
Keywords
hydrothermal power systems; load regulation; power engineering computing; scheduling; simulated annealing; algorithm; application; equivalent thermal generator; hydrothermal power systems; load balance constraint; load regulation; operation limits; performance; short-term hydro scheduling; simulated annealing; total water discharge constraint; two-interval schedule horizon; Costs; Dynamic programming; Fuels; Lagrangian functions; Power system simulation; Reservoirs; Scheduling algorithm; Simulated annealing; System testing; Thermal loading;
fLanguage
English
Publisher
ieee
Conference_Titel
Neural Networks to Power Systems, 1993. ANNPS '93., Proceedings of the Second International Forum on Applications of
Conference_Location
Yokohama, Japan
Print_ISBN
0-7803-1217-1
Type
conf
DOI
10.1109/ANN.1993.264327
Filename
264327
Link To Document