Title :
Study on Multiple Objective Optimization Method in Construction Project Management
Author :
Zhao Rui ; Liu Xiaojun
Author_Institution :
Sch. of Civil Eng., Xi´an Univ. of Archit. & Technol., Xi´an
Abstract :
Comprehensive tradeoff control on quality, construction duration, cost and resource equilibrium is main aspect of construction project management, and is significant for improving the benefits of construction projects. In this paper, firstly the time-cost relationship model, the quality-time relationship model and resource equilibrium-time model are set up separately, objectives of quality and resource equilibrium are introduced to traditional time-cost optimization model for comprehensive optimization. Furthermore, multiple objective model of schedule is established by synthesizing single-objective models of quality and resource equilibrium. Then, based on TOPSIS, comprehensive optimization scheme is selected according to relative approach degree. Finally a case study is presented to verify feasibility and practicability of method.
Keywords :
construction; project management; construction project management; multiple objective optimization; quality equilibrium; quality-time relationship model; resource equilibrium-time model; single-objective models; time-cost optimization model; Artificial intelligence; Civil engineering; Cost function; Engineering management; Intelligent networks; Optimization methods; Project management; Quality management; Resource management; Technology management;
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location :
Shanghai
Print_ISBN :
978-1-4244-1311-9
DOI :
10.1109/WICOM.2007.1301