DocumentCode :
3514717
Title :
First Substation with IEC61850 Commissioned in the Americas
Author :
Rodrigues, Jose ; Soldani, Leonardo ; Wong, Gordon
Author_Institution :
Siemens AG, Nuremberg
fYear :
2006
fDate :
15-18 Aug. 2006
Firstpage :
1
Lastpage :
5
Abstract :
The first substation in operation using IEC61850 in the Americas was Bujama of Luz del Sur in Peru. In this substation the standard was applied and fulfils all the requirements for substation automation. This paper describes this substation and the equipment
Keywords :
substation automation; Americas; IEC61850; substation automation; Automatic control; Communication standards; Communication system control; Communications technology; Ethernet networks; IEC standards; Manufacturing automation; Protocols; Substation automation; Substation protection; automation; communication; protocol; substation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission & Distribution Conference and Exposition: Latin America, 2006. TDC '06. IEEE/PES
Conference_Location :
Caracas
Print_ISBN :
1-4244-0287-5
Electronic_ISBN :
1-4244-0288-3
Type :
conf
DOI :
10.1109/TDCLA.2006.311500
Filename :
4104731