    Managing EHS of PV-related equipment at the National Renewable Energy Laboratory

  • Author

    McCuskey, Troy ; Nelson, Brent P.

  • Author_Institution
    Nat. Renewable Energy Lab., Golden, CO, USA
  • fYear
    2012
  • fDate
    3-8 June 2012
  • Abstract
    Managing environment, health, and safety (EHS) risks at a national laboratory, or university, can be intimidating to a researcher who is focused on research results. Laboratory research and development (R&D) operations are often driven by scientists with limited engineering support and lack well-refined equipment development resources. To add to the burden for a researcher, there is a plethora of codes, standards, and regulations that govern the safe installation and operation of photovoltaic-related R&D equipment-especially those involving hazardous production materials. To help guide the researcher through the vast list of requirements, the EHS office at NREL has taken a variety of steps. Organizationally, the office has developed hazard-specific laboratory-level procedures to govern particular activities. These procedures are a distillation of appropriate international codes, fire agencies, SEMI standards, U.S. Department of Energy orders, and other industry standards to those necessary and sufficient to govern the safe operation of a given activity. The EHS office works proactively with researchers after a concept for a new R&D capability is conceived to help guide the safe design, acquisition, installation, and operation of the equipment. It starts with a safety assessment at the early stages such that requirements are implemented to determine the level of risk and degree of complexity presented by the activity so appropriate controls can be put in place to manage the risk. As the equipment requirements and design are refined, appropriate equipment standards are applied. Before the “to-build” specifications are finalized, a process hazard analysis is performed to ensure that no single-point failure presents an unacceptable risk. Finally, as the tool goes through construction and installation stages, reviews are performed at logical times to ensure that the requisite engineering controls and design are in place and operational. Au- horization to operate is not given until adherence to these requirements is fully verified and documented. Operations continue under the conditions defined through this process and are reviewed with changing processes.
  • Keywords
    health hazards; photovoltaic power systems; power system management; renewable energy sources; risk management; safety; PV-related equipment; SEMI standards; U.S. Department of Energy orders; environment risks management; equipment standards; fire agencies; hazard-specific laboratory-level procedures; hazardous production materials; health risks management; industry standards; international codes; laboratory research and development; national laboratory; national renewable energy laboratory; national university; operations; photovoltaic-related R&D equipment; process hazard analysis; researcher; safety assessment; safety risks management; Chemicals; Hazards; Industries; Laboratories; Monitoring; Standards; Environment; NREL; codes; hazardous production materials; health (ESH); management; operations; safety; standards;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Photovoltaic Specialists Conference (PVSC), 2012 38th IEEE
  • Conference_Location
    Austin, TX
  • ISSN
    0160-8371
  • Print_ISBN
    978-1-4673-0064-3
  • Type

    conf

  • DOI
    10.1109/PVSC.2012.6317690
  • Filename
    6317690