• DocumentCode
    3515529
  • Title

    Constructive Backtracking Heuristic for Hybrid Flowshop Scheduling with Limited Waiting Times

  • Author

    Li, Tieke ; Li, Yan

  • Author_Institution
    Econ. & Manage. Sch., Univ. of Sci. & Technol. Beijing, Beijing
  • fYear
    2007
  • fDate
    21-25 Sept. 2007
  • Firstpage
    6671
  • Lastpage
    6674
  • Abstract
    This paper deals with the hybrid flowshop scheduling problem with limited waiting time constraint. The problem is to determine a schedule that minimizes the makespan for a given set of jobs over a finite planning horizon respecting the constraint that for each job the waiting time between two consecutive stages cannot be greater than a given upper bound. To solve the problem, a constructive backtracking heuristic algorithm is developed and experimentally analyzed. The proposed algorithm operates on the technique of so-called recursive backtracking which constructs a schedule from sequenced job the first to the last, and for each job from the first stage to the last, while respecting the limited waiting time constraint. Computational experiments show that the proposed algorithm performs well both in efficiency and effectiveness.
  • Keywords
    flow shop scheduling; constructive backtracking heuristic; finite planning horizon; hybrid flowshop scheduling; limited waiting times; recursive backtracking; Algorithm design and analysis; Heuristic algorithms; Job shop scheduling; Machinery production industries; Parallel machines; Processor scheduling; Scheduling algorithm; Technology management; Time factors; Upper bound;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4244-1311-9
  • Type

    conf

  • DOI
    10.1109/WICOM.2007.1637
  • Filename
    4341412