DocumentCode :
3517752
Title :
Advanced Scheduling Technology for More Efficient (Shorter) Resource Constrained Schedules
Author :
Kalton, Annaka ; Richards, Robert A.
Author_Institution :
Stottler Henke Assoc. Inc. (SHAI), San Mateo, CA
fYear :
2008
fDate :
1-8 March 2008
Firstpage :
1
Lastpage :
9
Abstract :
Due to the inherent complexity of resource constrained scheduling, the project durations of resource constrained project plans can be two times or more longer than needed. This paper shows that the scheduling engine used effects the project duration even for relatively small projects consisting of a few dozen tasks, and the effect can become enormous as the number of tasks grows into the thousands and a number of types and quantity of resources expands. Unfortunately, the type of algorithm used by most commercial project planning software for handling resources, is a relatively inefficient methodology for scheduling resource constrained projects.
Keywords :
aerospace computing; critical path analysis; maintenance engineering; planning; project management; scheduling; advanced scheduling technology; critical path project management; maintenance; project planning software; project scheduling; resource constrained scheduling; space shuttles; Application software; Engines; Machinery; NASA; Processor scheduling; Project management; Scheduling algorithm; Space shuttles; Space technology; Technology planning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Aerospace Conference, 2008 IEEE
Conference_Location :
Big Sky, MT
ISSN :
1095-323X
Print_ISBN :
978-1-4244-1487-1
Electronic_ISBN :
1095-323X
Type :
conf
DOI :
10.1109/AERO.2008.4526690
Filename :
4526690
Link To Document :
بازگشت