• DocumentCode
    3518730
  • Title

    Semiconductor system with multiple closed-loops constrains

  • Author

    Li, Na ; Zheng, Li ; Li, Quan-Lin

  • Author_Institution
    Tsinghua Univ., Beijing
  • fYear
    2007
  • fDate
    22-25 Sept. 2007
  • Firstpage
    484
  • Lastpage
    488
  • Abstract
    In semiconductor assembly and test factory, the carts which are used as transports and fixtures are always cycling in the system and they are enablers for the semiconductor production. The limited cart resource, especially when the several different kinds of carts are needed to perform the operation, affect the system performance quite significantly. In this paper, a production line with three machines and two WIP buffers, two types of carts, two loop and two cart buffers are addressed, all the processing times by these machines are assumed to be exponential. Markov models for this two-loop closed line with finite buffers were derived to explore the relationship between the system performance and system structure and parameters, such as the cart numbers. Based on numerical examples, some valuable insights on how to management these systems effectively were proposed.
  • Keywords
    assembling; production facilities; semiconductor device manufacture; Markov models; WIP buffers; cart buffers; multiple closed-loops constrains; production line; semiconductor assembly; semiconductor production; semiconductor system; Assembly systems; Closed loop systems; Integrated circuit modeling; Integrated circuit packaging; Manufacturing automation; Packaging machines; Production systems; Semiconductor device testing; System performance; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering, 2007. CASE 2007. IEEE International Conference on
  • Conference_Location
    Scottsdale, AZ
  • Print_ISBN
    978-1-4244-1154-2
  • Electronic_ISBN
    978-1-4244-1154-2
  • Type

    conf

  • DOI
    10.1109/COASE.2007.4341702
  • Filename
    4341702