Title :
Construction Time-Cost Trade-off Analysis Using Ant Colony Optimization Algorithm
Author :
Ya-ping, Kuang ; Ying, Xiong
Author_Institution :
Sch. of Civil Eng. & Archit., Zhejiang Univ., Hangzhou
Abstract :
Time-cost trade-off problem (TCTP) is one of the most important aspects of construction project planning and control. Construction planners must select appropriate resources, including crew size, equipment, methods and technologies to perform tasks of a construction project. In general, there is a trade-off between time and cost to complete a task; the less expensive the resources, the long it takes. Existing methods for time-cost trade-off analysis can be categorized into three areas: mathematical programming models, heuristic methods and global search algorithms. More recently, ant colony optimization algorithms (ACOA), which are evolutionary methods based on the foraging behavior of ants, have been successfully applied to a number of benchmark combinatorial optimization problems. The multiobjective model for TCTP proposed in this paper is powered by techniques using ACOA. One of the main goals of this paper is to investigate the applicability of an alternative intelligent search method in time-cost optimization. By incorporating with the modified adaptive weight approach (MAWA), the proposed model finds out the optimal solution and defines the Pareto front. The concept of the ACOA-based multiobjective TCTP model is implemented by a computer program, and a test example is conducted. The results indicate that the ACOA is proven to be an efficient means for searching optimal solutions in time-cost trade-off problems, and the model could assist decision-makers in concurrently arriving at an optimal project duration and total cost
Keywords :
Pareto optimisation; construction industry; cost-benefit analysis; critical path analysis; decision making; project management; search problems; ACOA-based multiobjective TCTP model; Pareto front; ant colony optimization algorithm; combinatorial optimization problems; computer program; construction project control; construction project planning; construction time-cost trade-off analysis; decision making; evolutionary methods; intelligent search method; modified adaptive weight approach; time-cost optimization; Algorithm design and analysis; Ant colony optimization; Costs; Engineering management; Genetic algorithms; Large-scale systems; Mathematical model; Mathematical programming; Power generation economics; Project management; Ant colony optimization algorithm (ACOA); Multiobjective; Pareto front; Time-cost trade-off problem (TCTP);
Conference_Titel :
Management Science and Engineering, 2006. ICMSE '06. 2006 International Conference on
Conference_Location :
Lille
Print_ISBN :
7-5603-2355-3
DOI :
10.1109/ICMSE.2006.314128