DocumentCode :
3523806
Title :
Scheduling of single-arm multi-cluster tools to achieve the minimum cycle time
Author :
QingHua Zhu ; NaiQi Wu ; Yan Qiao ; Mengchu Zhou
Author_Institution :
Dept. of Ind. Eng., Guangdong Univ. of Technol., Guangzhou, China
fYear :
2013
fDate :
6-10 May 2013
Firstpage :
3555
Lastpage :
3560
Abstract :
It is very challenging to schedule a multi-cluster tool to maximize its throughput. This work studies its one-wafer optimal periodic schedule. It is found that the key to schedule it is to determine its robots waiting times. A resource-oriented Petri net model is developed for it such that the robot waiting times are well modeled. Based on the model, optimality conditions are derived and the scheduling problem is reduced to the determination of robot waiting times. By the derived conditions, an optimal one-wafer optimal periodic schedule for a multi-cluster tool can be obtained by scheduling its individual cluster tools one by one. Then, a highly efficient algorithm is proposed to compute it for an entire multi-cluster tool.
Keywords :
Petri nets; industrial robots; production control; scheduling; semiconductor device manufacture; one-wafer optimal periodic schedule; resource-oriented Petri net model; robots waiting times; single-arm multicluster tool scheduling; throughput maximization; Color; Firing; Load modeling; Optimal scheduling; Robots; Schedules; Semiconductor device modeling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation (ICRA), 2013 IEEE International Conference on
Conference_Location :
Karlsruhe
ISSN :
1050-4729
Print_ISBN :
978-1-4673-5641-1
Type :
conf
DOI :
10.1109/ICRA.2013.6631075
Filename :
6631075
Link To Document :
بازگشت