• DocumentCode
    3523806
  • Title

    Scheduling of single-arm multi-cluster tools to achieve the minimum cycle time

  • Author

    QingHua Zhu ; NaiQi Wu ; Yan Qiao ; Mengchu Zhou

  • Author_Institution
    Dept. of Ind. Eng., Guangdong Univ. of Technol., Guangzhou, China
  • fYear
    2013
  • fDate
    6-10 May 2013
  • Firstpage
    3555
  • Lastpage
    3560
  • Abstract
    It is very challenging to schedule a multi-cluster tool to maximize its throughput. This work studies its one-wafer optimal periodic schedule. It is found that the key to schedule it is to determine its robots waiting times. A resource-oriented Petri net model is developed for it such that the robot waiting times are well modeled. Based on the model, optimality conditions are derived and the scheduling problem is reduced to the determination of robot waiting times. By the derived conditions, an optimal one-wafer optimal periodic schedule for a multi-cluster tool can be obtained by scheduling its individual cluster tools one by one. Then, a highly efficient algorithm is proposed to compute it for an entire multi-cluster tool.
  • Keywords
    Petri nets; industrial robots; production control; scheduling; semiconductor device manufacture; one-wafer optimal periodic schedule; resource-oriented Petri net model; robots waiting times; single-arm multicluster tool scheduling; throughput maximization; Color; Firing; Load modeling; Optimal scheduling; Robots; Schedules; Semiconductor device modeling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation (ICRA), 2013 IEEE International Conference on
  • Conference_Location
    Karlsruhe
  • ISSN
    1050-4729
  • Print_ISBN
    978-1-4673-5641-1
  • Type

    conf

  • DOI
    10.1109/ICRA.2013.6631075
  • Filename
    6631075