DocumentCode :
3523871
Title :
Production scheduling in a Steelmaking and Continuous Casting plant: A case study
Author :
Fanti, Maria Pia ; Rotunno, Giuliana ; Stecco, Gabriella ; Ukovich, Walter
Author_Institution :
Dept. of Electr. & Electron. Eng., Polytech. of Bari, Bari, Italy
fYear :
2013
fDate :
6-10 May 2013
Firstpage :
3580
Lastpage :
3585
Abstract :
This paper deals with the scheduling of operations in a Steelmaking and Continuous Casting (SM-CC) plant. In particular, we consider a real case study of an integrated plant located in the North of Italy. First, we describe in details the SM-CC process of the considered system by using the Unified Modeling Language. Second, we focus on the schedule of casts on the continuous casting machine that is subject to different types of setup operations. With the objective of minimizing the maximum completion time, the schedule of the continuous casting machine is modeled by a Mixed Integer Linear Programming formulation. An example enlightens how a proper scheduling of the casts is of basic importance to obtain good system performances.
Keywords :
Unified Modeling Language; casting; integer programming; linear programming; minimisation; production control; production equipment; scheduling; steel industry; steel manufacture; North of Italy; SM-CC plant; Unified Modeling Language; cast scheduling; continuous casting machine; integrated plant; maximum completion time minimization; mixed integer linear programming formulation; operations scheduling; production scheduling; steelmaking and continuous casting plant; Bars; Casting; Heating; Job shop scheduling; Steel; Unified modeling language;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation (ICRA), 2013 IEEE International Conference on
Conference_Location :
Karlsruhe
ISSN :
1050-4729
Print_ISBN :
978-1-4673-5641-1
Type :
conf
DOI :
10.1109/ICRA.2013.6631079
Filename :
6631079
Link To Document :
بازگشت