DocumentCode
3524959
Title
Aggregate hybrid flowshop scheduling with assembly operations
Author
Mahdavi, I. ; Komaki, Gh M. ; Kayvanfar, V.
Author_Institution
Dept. of Ind. Eng., Mazandaran Univ. of Sci. & Technol., Babol, Iran
Volume
Part 1
fYear
2011
fDate
3-5 Sept. 2011
Firstpage
663
Lastpage
667
Abstract
This paper deals with the hybrid flow shop scheduling (HFS) problem with assembly operation. The parts process on the hybrid flow shop stages and after that in order to produce the final product, several parts go under the assembly operations based on the predefined hierarchy structure of products. Each product has some sub-assembly operations and the final product obtains after completion of the last sub-assembly operation. Our aim in this study is finding the schedule that minimizes the completion time of last final product. For considered problem, we first propose an integer programming model and two heuristic algorithms are then employed. Since this problem is NP-hard, we apply the simulated annealing (SA) approach for large sized problems.
Keywords
aggregate planning; assembling; computational complexity; flow shop scheduling; integer programming; minimisation; simulated annealing; NP-hard problem; aggregate hybrid flowshop scheduling; completion time minimization; heuristic algorithm; integer programming model; product hierarchy structure; simulated annealing; subassembly operation; Assembly; Heuristic algorithms; Indexes; Job shop scheduling; Mathematical model; Schedules; Simulated annealing; Assembly Operation; Hybrid Flow Shop (HFS); Integer programming; Simulated Annealing (SA);
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-61284-446-6
Type
conf
DOI
10.1109/ICIEEM.2011.6035244
Filename
6035244
Link To Document