Title :
Application of grey prediction models in final assembly duration of civil aircraft
Author :
Guo, Wei-dong ; Wei, Fa-jie
Author_Institution :
Dept. of Manage. Sci. & Eng., Beihang Univ., Beijing, China
Abstract :
As a basis for rational organized production, yearly production program and production planning are made respectively according to assembly cycle, which is a significant link of the whole process and has a great impact on the performance, lifespan and cost of production itself. Aiming at the complicated process of airplane assembly and less sample data, combining with the characteristics of Grey System Theory, this paper chooses the GM (1, N) to obtain a precise model by estimating the aircraft assembly duration.
Keywords :
aircraft manufacture; assembling; grey systems; production planning; aircraft assembly duration; airplane assembly; civil aircraft; final assembly duration; grey prediction model; grey system theory; production planning; rational organized production; yearly production program; Aircraft; Assembly; Atmospheric modeling; Brain models; Predictive models; Production; Grey system theory; aircraft final assembly; estimate;
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location :
Changchun
Print_ISBN :
978-1-61284-446-6
DOI :
10.1109/ICIEEM.2011.6035476