DocumentCode :
3530104
Title :
Research on construction project process performance measurement
Author :
Bai, Jun-feng ; Yang, Xue-ying ; Tao, Li-hua
Author_Institution :
Changchun Univ. of Technol., Changchun, China
Volume :
Part 3
fYear :
2011
fDate :
3-5 Sept. 2011
Firstpage :
1915
Lastpage :
1918
Abstract :
Generally, Performance Assessment (PA) of Construction Subject (CS) is based on “Post-Evaluation”. For one-time construction process, PA has limited ability to evaluate the process objectively. The Basic Model of the evaluation upon Process Performance (PP) in Construction Project (CP) was setup in this paper by AHP based on the Fuzzy Evaluation Method, and also by the study of comparison between the Process Performance (PP) concept definition in the construction project and its evaluation, In the mean time, the Model provides the specific guide-lines for evaluation during Construction Project (CP) Performance Assessment (PA) management process.
Keywords :
construction; decision making; project management; AHP; construction project performance assessment management; construction project process performance measurement; construction subject; fuzzy evaluation method; post-evaluation; Concrete; Educational institutions; Organizations; Performance evaluation; Presses; Project management; Construction Project (CP); Evaluation of Screening (EOC); Process Performance (PP);
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location :
Changchun
Print_ISBN :
978-1-61284-446-6
Type :
conf
DOI :
10.1109/ICIEEM.2011.6035541
Filename :
6035541
Link To Document :
بازگشت