Title :
Opportunities And Challenges In Manufacturing Simulation For Busy Plant Engineers
Keywords :
Animation; Computational modeling; Costs; Floors; Job shop scheduling; Packaging; Power engineering and energy; Production facilities; Throughput; Virtual manufacturing;
Conference_Titel :
Simulation Conference Proceedings, 1989. Winter
Print_ISBN :
0-911801-58-8
DOI :
10.1109/WSC.1989.718765