Title :
The economic feasibility of four-phase AC overhead connections
Author :
Lauria, D. ; Mazzanti, G. ; Quaia, S.
Author_Institution :
Dept. of Electr. Eng., Univ. of Naples Federico II, Naples, Italy
Abstract :
The goal of this paper is assessing the economic feasibility of four-phase AC overhead connections, i.e. the real chance that such lines have of being competitive with commonly-used solutions for power transmission. For this reason, the paper illustrates an economical comparison among innovative 325 kV four-phase ac lines, traditional 400 kV three-phase ac lines and increasingly-popular 500 kV HVDC lines. These systems are considered firstly in single-circuit and secondly in double-circuit overhead arrangement. The comparison is based on the main cost items that characterize these lines, namely investment costs, energy losses costs and reliability-related costs. The uncertainty of the relevant parameters, particularly significant as far as innovative four-phase ac lines are concerned, is also discussed.
Keywords :
HVDC power transmission; power overhead lines; power transmission economics; power transmission faults; power transmission reliability; HVDC lines; double-circuit overhead arrangement; economic feasibility; energy losses costs; four-phase AC overhead connections; investment costs; power transmission; reliability-related costs; voltage 325 kV; voltage 400 kV; Conductors; DC-DC power converters; HVDC transmission; Investments; Propagation losses; Reliability; DC transmission; Four-phase AC transmission; power transmission; transmission lines;
Conference_Titel :
Clean Electrical Power (ICCEP), 2011 International Conference on
Conference_Location :
Ischia
Print_ISBN :
978-1-4244-8929-9
Electronic_ISBN :
978-1-4244-8928-2
DOI :
10.1109/ICCEP.2011.6036287