Title
Generation Investment Equilibria With Strategic Producers—Part II: Case Studies
Author
Kazempour, S. Jalal ; Conejo, Antonio J. ; Ruiz, Carlos
Author_Institution
Univ. Castilla-La Mancha, Ciudad Real, Spain
Volume
28
Issue
3
fYear
2013
fDate
Aug. 2013
Firstpage
2623
Lastpage
2631
Abstract
This paper analyzes numerically the approach reported in the companion paper for identifying generation investment equilibria in an electricity market where the producers behave strategically. To this end, a two-node illustrative example and a large-scale case study based on the IEEE reliability test system (RTS) are examined and the results obtained are reported and discussed.
Keywords
electricity supply industry; investment; power generation economics; power markets; power system reliability; IEEE reliability test system; electricity market; generation investment equilibria; large-scale case study; strategic producer; Buildings; Computer aided software engineering; Investments; Monopoly; Power transmission lines; Production; Security; Bilevel model; equilibrium problem with equilibrium constraints (EPEC); generation investment equilibria; mathematical program with equilibrium constraints (MPEC); strategic producer;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2012.2235468
Filename
6423856
Link To Document