DocumentCode :
354060
Title :
The invariability of an optimal schedule for single machine total tardiness problem with due date perturbation
Author :
Jiangeng, Li ; Fengsheng, Tu
Author_Institution :
Dept. of Autom., Nankai Univ., Tianjin, China
Volume :
3
fYear :
2000
fDate :
2000
Firstpage :
2004
Abstract :
The invariability of an optimal schedule for the single machine total tardiness problem with due dates perturbation is discussed. A conclusion is obtained that the range of the due dates in which a given optimal schedule keeps optimal is an interval (i.e. a convex set) when only one job due date varies, and it is not a convex set when multiple jobs due dates vary. Two methods are given to find the interval of any given job due date in which an optimal schedule keep optimal: the dynamic programming algorithm and trial method
Keywords :
dynamic programming; operations research; production control; due dates; dynamic programming; perturbation; production control; robustness; scheduling; single machine system; total tardiness; Automation; Dynamic programming; Dynamic scheduling; Heuristic algorithms; Job shop scheduling; Optimal scheduling; Partial response channels; Robustness; Scheduling algorithm; Single machine scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation, 2000. Proceedings of the 3rd World Congress on
Conference_Location :
Hefei
Print_ISBN :
0-7803-5995-X
Type :
conf
DOI :
10.1109/WCICA.2000.862925
Filename :
862925
Link To Document :
بازگشت