Title :
An efficient approach to reduce search space of capacity planning for PWB assembly system: deterministic demand
Author :
Zhongsheng, Hua ; Xiaojian, Chen ; Guolian, Chen
Author_Institution :
Sch. of Bus., Univ. of Sci. & Technol. of China, Hefei, China
Abstract :
A model of production assignment (PA) planning and equipment changeover scheduling (ECSP) for printed wiring board (PWB) assembly systems at the aggregate level is developed. In the described model, three kinds of equipment changeover methods, i.e. adding machine, removing machine and transferring machine, are involved. Since the ECSP model is a large-scale integer-programming problem, two approximate solution approaches for single period problem are described, which will provide a search space for finding a solution to the multiple-period problem. Computational experiments confirm the conclusions
Keywords :
assembly planning; integer programming; printed circuit manufacture; production control; search problems; assembly; capacity planning; equipment changeover scheduling; integer-programming; multiple-period problem; printed wiring board; production assignment; production control; production planning; search space; single period problem; Aggregates; Assembly systems; Capacity planning; Computer science; Cost function; Investments; Processor scheduling; Production planning; Production systems; Technology planning;
Conference_Titel :
Intelligent Control and Automation, 2000. Proceedings of the 3rd World Congress on
Conference_Location :
Hefei
Print_ISBN :
0-7803-5995-X
DOI :
10.1109/WCICA.2000.862932