DocumentCode :
356227
Title :
Cable remediation program cost management using silicone injection
Author :
Jaeger, C.O.
Author_Institution :
Puget Sound Energy, USA
Volume :
1
fYear :
2000
fDate :
2000
Firstpage :
557
Abstract :
The efforts of one utility to address escalating underground outages while controlling cost and meeting customer expectations has led to the widespread use of silicone injection. After years of replacing cable at high economic cost, Puget Sound Energy (PSE) has implemented a process designed to reduce program costs without impacting reliability results. Cable injection provides long-term reliability results at a fraction of the cost of trenching through established cities and neighborhoods to replace aging cable
Keywords :
power cable insulation; reliability; silicone insulation; underground cables; Puget Sound Energy; aging cable replacement; cable remediation program; cost management; long-term reliability; silicone injection; underground outages; Cable insulation; Cities and towns; Costs; Customer service; Databases; History; Power cables; Power generation economics; Process design; Trees - insulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society Summer Meeting, 2000. IEEE
Conference_Location :
Seattle, WA
Print_ISBN :
0-7803-6420-1
Type :
conf
DOI :
10.1109/PESS.2000.867645
Filename :
867645
Link To Document :
بازگشت