• DocumentCode
    3570421
  • Title

    Tabu search approach for Multi-Skill Resource-Constrained Project Scheduling Problem

  • Author

    Skowronski, Marek E. ; Myszkowski, Pawel B. ; Adamski, Mariusz ; Kwiatek, Pawel

  • Author_Institution
    Dept. of Artificial Intell., Wroclaw Univ. of Technol., Wrocław, Poland
  • fYear
    2013
  • Firstpage
    153
  • Lastpage
    158
  • Abstract
    In this article two approaches of Tabu Search in Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP) have been proposed, based on different neighbourhood generation methods. The first approach assumes swapping resources assigned to pair of tasks, while the second one proposes assigning any resource that could perform given task. Both approaches need to respect the skill constraints. The objective of this paper is to research the usability and robustness of proposed approaches in solving MS-RCPSP. Experiments have been performed using artificially created dataset instances, based on real-world instances, got from Volvo IT and verified by experienced project manager. Presented results show that Tabu Search (TS) based methods are efficient approaches that could be developed in the further work.
  • Keywords
    project management; scheduling; search problems; MS-RCPSP; Volvo IT; dataset instances; multiskill resource-constrained project scheduling problem; neighbourhood generation methods; project manager; swapping resources; tabu search approach; usability; Optimization; Processor scheduling; Robustness; Schedules; Scheduling; Standards; Vectors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Science and Information Systems (FedCSIS), 2013 Federated Conference on
  • Type

    conf

  • Filename
    6643991