Title :
Fermilab collider Run 1b statistics
Author :
Bharadwaj, V. ; Crawford, J. ; Mau, R.
Author_Institution :
Fermi Nat. Accel. Lab., Batavia, IL, USA
Abstract :
The present Fermilab Tevatron Collider run, designated as Run 1b, started in October 1993 and will conclude in July 1995. This paper summarizes the parameters and performance of the Fermilab accelerator complex to date. Operational problems encountered during the run are described as well as the factors that limit peak and delivered luminosities
Keywords :
colliding beam accelerators; proton accelerators; storage rings; synchrotrons; Fermilab accelerator complex; Fermilab collider Run 1b statistics; Tevatron; integrated luminosities; peak luminosity; performance numbers; Colliding beam accelerators; Laboratories; Lightning; Particle beams; Power supplies; Proton accelerators; Stacking; Statistics; Storage rings; Synchrotrons;
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Print_ISBN :
0-7803-2934-1
DOI :
10.1109/PAC.1995.504685