DocumentCode :
3572677
Title :
Lagrangian relaxation algorithms for hybrid flow-shop with earliness/tardiness scheduling problems
Author :
Xiaoli Ding ; Chang Liu ; Jun Zhu ; Dong Li
Author_Institution :
Shenyang Inst. of Autom., Shenyang, China
fYear :
2014
Firstpage :
1257
Lastpage :
1260
Abstract :
This paper considers the characteristics of a hybrid flow shop with JIT technical constraints. Lagrangian relaxation is presented to solve the Earliness/Tardiness problem in the hybrid flow-shop. By introducing precedence constraints into the objective function, the original problem is decomposed into a series of parallel machine sub-problems and a dynamic programming algorithm is designed to solve these sub-problems. Heuristic approach is further applied to convert the infeasible solution into a feasible solution. Testing results demonstrated that the proposed method can generate near optimal schedules in an acceptable computational time.
Keywords :
dynamic programming; flow shop scheduling; just-in-time; JIT technical constraints; Lagrangian relaxation algorithm; dynamic programming algorithm; earliness scheduling problem; hybrid flow-shop scheduling; just-in-time; objective function; parallel machine sub-problem; precedence constraints; tardiness scheduling problem; Job shop scheduling; Linear programming; Optimal scheduling; Parallel machines; Processor scheduling; Schedules; Earliness/Tardiness problem; Hybrid flow shop; Lagrangian relaxation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation (WCICA), 2014 11th World Congress on
Type :
conf
DOI :
10.1109/WCICA.2014.7052900
Filename :
7052900
Link To Document :
بازگشت