DocumentCode
3576518
Title
An improved approach for the quay crane assignment problem with limited availability of internal trucks in container terminal
Author
Karam, A. ; Eltawif, A.B. ; Harraz, N.A.
Author_Institution
Dept. of Ind. Eng. & Syst. Manage., Egypt - Japan Univ. of Sci. & Technol. (E-JUST), Alexandria, Egypt
fYear
2014
Firstpage
112
Lastpage
116
Abstract
In container terminals, the handling operation of containers depends on the interaction among handling equipment such as quay cranes, yard cranes and internal trucks. Insufficient number of internal trucks causes a delay in transporting containers and results in low productivity of quay cranes which is the bottleneck of any container terminal. This paper presents a new approach for assigning quay cranes in container terminal taking into consideration the availability of internal truscks. A two phase solution methodology is proposed. In the first phase, a MIP model is formulated to assign quay cranes to vessels while in the second phase, dynamic programming is used to determine the specific quay cranes to serve each vessel. The validity of the proposed approach is demonstrated by a comparison against a case study from literature. Moreover, the results show that the shortage in the required number of internal trucks increases the average handling time per vessel.
Keywords
cranes; freight handling; goods distribution; integer programming; sea ports; MIP model; container handling operation; container terminal; dynamic programming; internal truck availability; quay crane assignment problem; Availability; Containers; Cranes; Educational institutions; Productivity; Resource management; Schedules; container terminals; internal truck; quay crane assignment; quay side;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2014 IEEE International Conference on
Type
conf
DOI
10.1109/IEEM.2014.7058611
Filename
7058611
Link To Document