• DocumentCode
    357856
  • Title

    The EMC management of the project compliance process

  • Author

    Sims, Thomas P.

  • Author_Institution
    Diversified TEST Technol. Inc., Groton, NY, USA
  • Volume
    1
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    263
  • Abstract
    This paper compares the growth of regulatory compliance requirements with the associated costs, benefits of safety protection, the environment and the benefit to the user and those being regulated
  • Keywords
    conformance testing; electromagnetic compatibility; electronic equipment testing; legislation; project management; protection; safety; standards; EMC management; FCC; costs; electronics industry; environment; project compliance; regulatory compliance requirements; safety protection; standards regulation; Air safety; Electromagnetic compatibility; FCC; Microprocessors; Oscillators; Product safety; Project management; Protection; Radiofrequency interference; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electromagnetic Compatibility, 2000. IEEE International Symposium on
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-5677-2
  • Type

    conf

  • DOI
    10.1109/ISEMC.2000.875574
  • Filename
    875574