DocumentCode
357856
Title
The EMC management of the project compliance process
Author
Sims, Thomas P.
Author_Institution
Diversified TEST Technol. Inc., Groton, NY, USA
Volume
1
fYear
2000
fDate
2000
Firstpage
263
Abstract
This paper compares the growth of regulatory compliance requirements with the associated costs, benefits of safety protection, the environment and the benefit to the user and those being regulated
Keywords
conformance testing; electromagnetic compatibility; electronic equipment testing; legislation; project management; protection; safety; standards; EMC management; FCC; costs; electronics industry; environment; project compliance; regulatory compliance requirements; safety protection; standards regulation; Air safety; Electromagnetic compatibility; FCC; Microprocessors; Oscillators; Product safety; Project management; Protection; Radiofrequency interference; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Electromagnetic Compatibility, 2000. IEEE International Symposium on
Conference_Location
Washington, DC
Print_ISBN
0-7803-5677-2
Type
conf
DOI
10.1109/ISEMC.2000.875574
Filename
875574
Link To Document