• DocumentCode
    3578993
  • Title

    Optimal generation scheduling of thermal units with considering startup and shutdown ramp limits

  • Author

    Selvakumar, K. ; Santhoshkumar, G. ; Sakthivel, C.

  • Author_Institution
    Dept. of EEE, SRM University, Kattankulathur, India - 603203
  • fYear
    2014
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper presents a generation scheduling of thermal units considering startup and shutdown ramp limits by using Shuffled Frog Leaping Algorithm. TheStartup and shutdown ramp limits are does not consider in the conventional method of unit commitment (UC). Without considering the ramp limits in generation scheduling problem, solution for large power system does not give practical value. The objective of proposed work is to determine the optimal committed of thermal generating units at minimum operating cost while considering load demand, spinning reserve and otherequality and inequality constraints at each hour time interval. The solution obtained from the proposed Shuffled Frog Leaping Algorithm(SFLA) for four unit system is compared with other conventional methods.
  • Keywords
    Algorithm design and analysis; Fuels; Heuristic algorithms; Optimization; Power generation; Scheduling; Shuffled Frog Leaping Algorithm (SFLA); Shutdown Ramp limit; Startup Ramp limit; Unit Commitment;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Intelligence and Computing Research (ICCIC), 2014 IEEE International Conference on
  • Print_ISBN
    978-1-4799-3974-9
  • Type

    conf

  • DOI
    10.1109/ICCIC.2014.7238310
  • Filename
    7238310