DocumentCode :
3581065
Title :
Studies on algorithms of power system probabilistic production simulation considering wind farms
Author :
Jia Lei ; Chulin Wan ; Haoyong Chen ; Hailin Ge ; Zhongfu Wang
Author_Institution :
Sch. of Electr. Power, South China Univ. of Technol., Guangzhou, China
fYear :
2014
Firstpage :
1
Lastpage :
6
Abstract :
There are some problems of the existing algorithms of the power system probabilistic production simulation, such as inaccurate description of wind power output and great quantity of computation. For the problems, a new probabilistic production simulation method based on chronological load curve will be proposed in this paper. Firstly, the wind speed ARAM model based on the characteristics of wind power is used to simulate the uncertainty and time-varying patterns of wind power. Secondly, an algorithm of probabilistic production simulation based on available capacity distribution (ACD) is adopted to calculate wind power expected output. Then combining the chronological load curve with thermal power unit available capacity probability density function to simulate thermal power. Finally, the final expected output of thermal power unit and system reliability indexes can be gotten. The algorithm can not only reflect the randomness of wind power output but also can reflect the time-varying patterns of wind power and load. In addition, it can simplify the process of probabilistic production simulation and improve the calculation efficiency. By the end of the article, the effectiveness of the method was verified based on the data of IEEE-RTS system.
Keywords :
power system simulation; probability; thermal power stations; wind power plants; IEEE-RTS system; available capacity distribution; capacity probability density function; chronological load curve; power system probabilistic production simulation; probabilistic production simulation; production simulation method; thermal power unit; time-varying patterns; wind farms; wind power output; wind speed ARAM model; Capacity planning; Load modeling; Power systems; Wind farms; Wind power generation; Wind speed; ARAM model; available capacity distribution; chronological load curve; probabilistic production simulation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Engineering Conference (APPEEC), 2014 IEEE PES Asia-Pacific
Type :
conf
DOI :
10.1109/APPEEC.2014.7066081
Filename :
7066081
Link To Document :
بازگشت