Modeling a Conceptual Framework for Owner-Contractor Relationship and Time-Cost Trade-Off Using Fuzzy Logic Techniques
Author :
Al Hazza, Muataz Hazza F. ; Al Fadel, Mohammad ; Adesta, Erry Yulian Triblas
Author_Institution :
Int. Islamic Univ. Malaysia, Kuala Lumpur, Malaysia
fYear :
2014
Firstpage :
179
Lastpage :
183
Abstract :
This paper proposes a conceptual framework for owner- contractor relationship and time-cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocation to avoid any cost overrun. During the life cycle of the project, different problems can appear. The most important ones are delay and construction cost overrun during the executing phase of the project. To avoid that, an effective planning system with effective control technique is a crucial issue. The main objectives of this research are to develop and design a conceptual framework that may be a guide for the contractor and the owner for controlling the construction projects. The results show that a good conceptual framework need to start with breaking down the project in conjunction with analyzing the cost and time to have both the contractor and the owner the better and less risk in having a good proposal in time, cost and quality. However the final framework show that a need for continuous feedback from the owner to the contractor during the planning process and also can help in designing and developing a proposal that satisfy both the contractor and the owner in terms in time, cost and quality. Risk assessment should be one of the main factors that should be considered during all steps in monitoring, planning and controlling the project. Finally a simulation has been done using the Fuzzy logic approach to validate the conceptual framework).
Keywords :
construction industry; cost reduction; fuzzy set theory; industrial economics; lead time reduction; resource allocation; risk analysis; strategic planning; construction cost overrun; construction project control system; delay; fuzzy logic technique; owner-contractor relationship; project monitoring; project planning; resource allocation; risk assessment; time-cost trade-off; Complexity theory; Contracts; Delays; Fuzzy logic; Planning; Project management; Risk management; Modeling; conceptual framework; construction project; fuzzy logic;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Computer Science Applications and Technologies (ACSAT), 2014 3rd International Conference on
Type :
conf
DOI :
10.1109/ACSAT.2014.38
Filename :
7076890
Link To Document :
بازگشت