On the and-or-scheduling problems
Author :
Wuu Yang ; Ming-Hsiang Huang ; Jenq-Kuen Lee
Author_Institution :
Dept. of Comput. Sci., Nat. Chiao Tung Univ., Hsinchu, Taiwan
fYear :
2014
Firstpage :
969
Lastpage :
974
Abstract :
In the and-or scheduling model, a project consists of several tasks. Each task has a duration attribute. A task can be performed only when all of its requirements are satisfied. After a task is completed, more requirements become satisfied. A characteristic of the AOscheduling projects is that a requirement may be satisfied in several ways. Several questions concerning AOscheduling might be interesting, including whether the project can be completed, the earliest time a project can be completed, the minimal number of processors needed to complete the project, and assigning tasks to processors, etc. We use Petri nets and segment graphs to analyze AOscheduling projects.
Keywords :
Petri nets; graph theory; scheduling; AOscheduling project; Petri nets; and-or-scheduling problem; duration attribute; project task; segment graph; Computational modeling; Computer science; Delays; Interference; Petri nets; Processor scheduling; Program processors; Petri net; and-or scheduling; scheduling; segment graph;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Parallel and Distributed Systems (ICPADS), 2014 20th IEEE International Conference on
Type :
conf
DOI :
10.1109/PADSW.2014.7097917
Filename :
7097917
Link To Document :
بازگشت