DocumentCode
3595093
Title
Application of Work Study to the Automobile Assembling Line Balancing
Author
Hong, Lu ; Kaihu, Hou ; Wenli, Shi
Author_Institution
Fac. of Mech. & Electr. Eng., KMUST, Kunming, China
Volume
3
fYear
2009
Firstpage
358
Lastpage
362
Abstract
Based on the investigation of automobile interior decoration assembling line, this paper uses the time study approaches to measure the operating time of the interior decoration assembling line, identifies the bottleneck positions, analyzes the current problems in the assembling line by "5W1H" technology; and balances the assembling line on the basis of activity analysis methods (AAM), ECRS (Eliminate, Combine, Rearrange, and Simplify) and the assembling line balancing theory, and finally improves the productivity.
Keywords
assembling; automobile manufacture; productivity; 5W1H technology;; activity analysis methods; automobile assembling line balancing; automobile interior decoration assembling line; productivity; Assembly; Automobiles; Costs; Industrial engineering; Information analysis; Personnel; Position measurement; Production; Productivity; Time measurement; assembling line balancing; bottleneck positions; work measurement; work study;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering, 2009 International Conference on
Print_ISBN
978-0-7695-3876-1
Type
conf
DOI
10.1109/ICIII.2009.395
Filename
5369183
Link To Document