DocumentCode
3596543
Title
Placement of PMUs in HVDC connected networks considering voltage stability requirements
Author
Dalali, Milad ; Kargar, Hossein Kazemi
Author_Institution
Dept. of Electr. & Comput. Eng., Shahid Beheshti Univ., Tehran, Iran
fYear
2014
Firstpage
1
Lastpage
5
Abstract
Optimal PMU placement (OPP) is often done for full observability of network with minimum number of PMUs and maximum redundancy. On the other hand, placement of PMUs at HVDC connected buses is necessary for estimation of voltage stability margin. In this paper, OPP is done to achieve all of above goals. Binary integer linear programming (BILP) is used as solver algorithm, due to linear and binary characteristics of problem. OPP is tested on IEEE 14-bus test system and impact of HVDC location is studied on the number of required PMUs. Finally, different contingencies consist of single PMU failure, single line outage and occurrence of simultaneous events are presented in the paper.
Keywords
HVDC power transmission; integer programming; linear programming; phasor measurement; BILP; HVDC connected networks; IEEE 14-bus test system; OPP; binary integer linear programming; optimal PMU placement; voltage stability requirements; Current measurement; HVDC transmission; Observability; Phasor measurement units; Power system stability; Redundancy; Voltage measurement; HVDC; Optimal PMU placement (OPP); contingency; observability; voltage stability;
fLanguage
English
Publisher
ieee
Conference_Titel
Smart Grid Conference (SGC), 2014
Print_ISBN
978-1-4799-8313-1
Type
conf
DOI
10.1109/SGC.2014.7151036
Filename
7151036
Link To Document