DocumentCode
3596943
Title
A New Heuristic Method for Job-Shop Scheduling Problem
Author
Liu, Kuang-Ping
Author_Institution
Nat. Taiwan Univ., Taipei
Volume
5
fYear
2006
Firstpage
3708
Lastpage
3714
Abstract
We describe a heuristic method for solving the minimum makespan problem of job shop scheduling. It makes use of the disjunctive graph, and set the direction of the disjunctive arcs as decision variables. The decision variables, as micro bottlenecks, are cleared one by one, following the critical path algorithm. Once a new disjunctive arc is adopted all the implicit disjunctive arcs will be decided. The time complexity is O (n2). Computational testing is performed to solve the notorious ten machines /ten jobs problem in running time of 8.272 CPU seconds on a P-II 450 MHz PC, however, without finding an optimal solution. Finally, we verified the algorithm by testing a 100x30 (100 jobs/30 machines) problem, which may contribute to be one of the new benchmark problems.
Keywords
computational complexity; graph theory; job shop scheduling; processor scheduling; critical path algorithm; decision variables; disjunctive arcs; disjunctive graph; heuristic method; job-shop scheduling problem; minimum makespan problem; time complexity; Benchmark testing; Cybernetics; Heuristic algorithms; History; Job shop scheduling; Linear programming; Optimal scheduling; Performance evaluation; Processor scheduling; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2006. SMC '06. IEEE International Conference on
Print_ISBN
1-4244-0099-6
Electronic_ISBN
1-4244-0100-3
Type
conf
DOI
10.1109/ICSMC.2006.384706
Filename
4274471
Link To Document