• DocumentCode
    3597761
  • Title

    A rationalised policy for application and setting of back-up protection on the CEGB supergrid system

  • Author

    Inglesfield, R.

  • Author_Institution
    CEGB, Brackley, UK
  • fYear
    1989
  • Firstpage
    201
  • Lastpage
    205
  • Abstract
    There has been increasing pressure from system operators for back-up protection settings which allow unrestricted use of primary plant loading capability. Performance objectives and a setting policy for back-up protection have been developed. The setting policy provides an acceptable compromise between the conflicting requirements of protection sensitivity and system loading. It also seeks to minimise the engineering resources required for the determination of the settings
  • Keywords
    power system protection; CEGB supergrid system; back-up protection settings; engineering resources; protection sensitivity; setting policy; system loading;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Developments in Power Protection, 1989., Fourth International Conference on
  • Type

    conf

  • Filename
    20662