DocumentCode :
3622588
Title :
Prediction of power equipment failures based on chronological failure records
Author :
P.M. Djuric;M.M. Begovic;J. Ferkel
Author_Institution :
Dept. of Electr. & Comput. Eng., Stony Brook Univ., NY, USA
fYear :
2006
fDate :
6/28/1905 12:00:00 AM
Lastpage :
1210
Abstract :
When power utility asset managers are facing the task of resource planning for future deployment, often times, only partial information is available: installation dates and amounts, as well as failure and replacement rates. By combining records on yearly populations of the components, estimation of failure model parameters may be possible. Parametric models may then be used for forecasting of the system´s short term future failure rates and for formulation of replacement strategies. We employ the Weibull distribution and show how we estimate its parameters from past failure data. With the obtained estimates, we forecast future failures and keep on improving the estimates as new data become available
Keywords :
"Predictive models","Weibull distribution","Stress","Power engineering computing","Power engineering and energy","Asset management","Energy management","Resource management","Technology management","Engineering management"
Publisher :
ieee
Conference_Titel :
Circuits and Systems, 2006. ISCAS 2006. Proceedings. 2006 IEEE International Symposium on
Print_ISBN :
0-7803-9389-9
Type :
conf
DOI :
10.1109/ISCAS.2006.1692808
Filename :
1692808
Link To Document :
بازگشت