Title
Superposition of critical paths based on analytical and numerical method
Author
Jevtic Vesna;Letic Dusko
Author_Institution
Technical Faculty ?Mihajlo Pupin?/Informatics Department, Zrenjanin, Serbia
fYear
2009
Firstpage
371
Lastpage
374
Abstract
One of the results of the network planning is a diagram that has identified critical path whose duration is equal to the project duration. For the purpose of the research in this paper, network diagram is observed with critical and subcritical paths and the influence of subcritical path on project duration is taken into the consideration. Superposition has been applied in order to define project duration, i.e. getting resulting - superponed path. Used methods are: analytical method - based on Clark´s equations and numerical method - Monte Carlo simulation. Analytical method was basis for developing the project duration assessment model, which main characteristics are also presented in this paper.
Keywords
"Gaussian distribution","Path planning","Random variables","Stochastic processes","Integral equations","Informatics","Physics","Mathematics","Differential equations","Process planning"
Publisher
ieee
Conference_Titel
Intelligent Systems and Informatics, 2009. SISY ´09. 7th International Symposium on
ISSN
1949-047X
Print_ISBN
978-1-4244-5348-1
Electronic_ISBN
1949-0488
Type
conf
DOI
10.1109/SISY.2009.5291128
Filename
5291128
Link To Document