• DocumentCode
    3633594
  • Title

    Superposition of critical paths based on analytical and numerical method

  • Author

    Jevtic Vesna;Letic Dusko

  • Author_Institution
    Technical Faculty ?Mihajlo Pupin?/Informatics Department, Zrenjanin, Serbia
  • fYear
    2009
  • Firstpage
    371
  • Lastpage
    374
  • Abstract
    One of the results of the network planning is a diagram that has identified critical path whose duration is equal to the project duration. For the purpose of the research in this paper, network diagram is observed with critical and subcritical paths and the influence of subcritical path on project duration is taken into the consideration. Superposition has been applied in order to define project duration, i.e. getting resulting - superponed path. Used methods are: analytical method - based on Clark´s equations and numerical method - Monte Carlo simulation. Analytical method was basis for developing the project duration assessment model, which main characteristics are also presented in this paper.
  • Keywords
    "Gaussian distribution","Path planning","Random variables","Stochastic processes","Integral equations","Informatics","Physics","Mathematics","Differential equations","Process planning"
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems and Informatics, 2009. SISY ´09. 7th International Symposium on
  • ISSN
    1949-047X
  • Print_ISBN
    978-1-4244-5348-1
  • Electronic_ISBN
    1949-0488
  • Type

    conf

  • DOI
    10.1109/SISY.2009.5291128
  • Filename
    5291128