DocumentCode
3637516
Title
Limitations in the design of ancillary service markets imposed by communication network delays
Author
R. M. Hermans;A. Jokić;P. P. J. van den Bosch;J. Frunt;I. G. Kamphuis;C. J. Warmer
Author_Institution
Department of Electrical Engineering, Eindhoven University of Technology, P.O. Box 513, 5600 MB, The Netherlands
fYear
2010
Firstpage
1
Lastpage
6
Abstract
Real-time balancing of the European electricity grid will become increasingly dependent on market-based control mechanisms that are enabled by connecting millions of prosumers to an open communication network. The use of communication systems inevitably introduces delays in the energy balancing control loop, which could endanger market operation and stability of the electricity grid. By investigating the interaction between price-based control algorithms for real-time balancing and information and communication technology, we aim to provide systematic design rules for unrestricted ancillary service markets.
Keywords
"Electricity","Clocks","Delay"
Publisher
ieee
Conference_Titel
Energy Market (EEM), 2010 7th International Conference on the European
Print_ISBN
978-1-4244-6838-6
Type
conf
DOI
10.1109/EEM.2010.5558671
Filename
5558671
Link To Document