• DocumentCode
    3637516
  • Title

    Limitations in the design of ancillary service markets imposed by communication network delays

  • Author

    R. M. Hermans;A. Jokić;P. P. J. van den Bosch;J. Frunt;I. G. Kamphuis;C. J. Warmer

  • Author_Institution
    Department of Electrical Engineering, Eindhoven University of Technology, P.O. Box 513, 5600 MB, The Netherlands
  • fYear
    2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Real-time balancing of the European electricity grid will become increasingly dependent on market-based control mechanisms that are enabled by connecting millions of prosumers to an open communication network. The use of communication systems inevitably introduces delays in the energy balancing control loop, which could endanger market operation and stability of the electricity grid. By investigating the interaction between price-based control algorithms for real-time balancing and information and communication technology, we aim to provide systematic design rules for unrestricted ancillary service markets.
  • Keywords
    "Electricity","Clocks","Delay"
  • Publisher
    ieee
  • Conference_Titel
    Energy Market (EEM), 2010 7th International Conference on the European
  • Print_ISBN
    978-1-4244-6838-6
  • Type

    conf

  • DOI
    10.1109/EEM.2010.5558671
  • Filename
    5558671