DocumentCode
3638162
Title
Notice of Retraction
Application of integrated geological prediction in expressway tunnel
Author
Sheng Chen; Jiahua Shu;Qiaosen Lǚ; Guichun Zhu
Author_Institution
Faculty of Engineering, China University of Geosciences, Wuhan, Hubei, China
Volume
1
fYear
2010
Firstpage
540
Lastpage
543
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Because of the complicated geological conditions of tunnel surrounding rocks, it is of necessity to operate geological prediction during tunnel construction. Geology analysis, seismic wave method (TSP was adopted) and GPR (ground penetrating radar) are used to make prediction in the construction of Gaojiabao Tunnel. The utilization of several prediction methods that can be seen as an integrated prediction system can avoid one-sided conclusion obtained by single method. Moreover, ach conclusion can be checked and made up mutually. The application result shows that the prediction conclusions are relatively accurate, which can meet the needs of safe construction.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Because of the complicated geological conditions of tunnel surrounding rocks, it is of necessity to operate geological prediction during tunnel construction. Geology analysis, seismic wave method (TSP was adopted) and GPR (ground penetrating radar) are used to make prediction in the construction of Gaojiabao Tunnel. The utilization of several prediction methods that can be seen as an integrated prediction system can avoid one-sided conclusion obtained by single method. Moreover, ach conclusion can be checked and made up mutually. The application result shows that the prediction conclusions are relatively accurate, which can meet the needs of safe construction.
Keywords
"Geology","Ground penetrating radar","Accuracy"
Publisher
ieee
Conference_Titel
Geoscience and Remote Sensing (IITA-GRS), 2010 Second IITA International Conference on
Print_ISBN
978-1-4244-8514-7
Type
conf
DOI
10.1109/IITA-GRS.2010.5602912
Filename
5602912
Link To Document