DocumentCode :
3639622
Title :
Matching production planning and ship arrival scheduling by simulation
Author :
Marcelo Moretti Fioroni;Sydney Santos Cordeiro;Luiz Augusto G. Franzese;Luiz Francisco da Silva;Caio Eduardo Zanin;Vítor Luciano de Almeida Benevides;José Alexandre Sereno Quintáns;Lúcia Dini Pereira;Isac Reis de Santana;Paulo
Author_Institution :
Paragon Tecnologia, Rua Clodomiro Amazonas, 1435, 5th floor, 04537-012 Sã
fYear :
2010
Firstpage :
1990
Lastpage :
1997
Abstract :
There are several challenges involving the representation of an ore loading port system using a simulation package. This kind of port handles bulk material, much more adequately represented by continuous flow than discrete flow, as in opposite to the case of a container-handling port. This paper addresses specifically the impact of meeting product mix requirements in the delivery and the ship arrival schedules. A method to model this feature is presented. Also, the modeling approach of these aspects is presented, and the experimentation in the case of Porto do Açu, located at Rio de Janeiro, is performed to check the method´s efficiency.
Keywords :
"Marine vehicles","Materials","Delay","Load modeling","Production planning","Loading"
Publisher :
ieee
Conference_Titel :
Simulation Conference (WSC), Proceedings of the 2010 Winter
ISSN :
0891-7736
Print_ISBN :
978-1-4244-9866-6
Electronic_ISBN :
1558-4305
Type :
conf
DOI :
10.1109/WSC.2010.5678874
Filename :
5678874
Link To Document :
بازگشت